Cooling Way: | Water Cooling |
---|---|
Control: | Automatic |
Style: | Solid State High Frequency |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.TUBES
|
||||
|
Tube diameters (mm)
|
25~89 or 76~165 or 114~219
|
||
|
Tube wall thickness(mm)
|
2~15
|
||
|
Tube length (mm)
|
5000~28000
|
||
|
Tube material
|
Carbon steel, low alloy steel, stainless steel, heat resistant high, high alloy steel
|
||
2.FIN
|
||||
|
Fin thickness(mm)
|
0.8-3
|
||
|
Fin height(after welding) (mm)
|
10-35
|
||
|
Fin material
|
Carbon steel, low alloy steel, stainless steel.
|
||
|
Segment Width(mm)-for serrated fins
|
4
|
||
|
Uncut base(mm)-for serrated fins
|
8(±1.7mm)
|
||
3. ELECTRIC EQUIPMENT
|
||||
|
hi-frequency welding equipment
|
GP300KW-H
|
||
|
frequency converter,PLC, Contact operation screen
|
SIMENS
|
||
4.PERFORMANCE PARAMETERS(works size)
|
||||
|
Fin per inch(FPI)
|
1-6
|
||
|
Welding position from tube(mm)
|
70
|
||
5.TESTING
|
||||
|
Tensile Test
|
Acceptance criteria-170Mpa
|
||
|
Fin tube straightness
|
MAX.5mm per 3000mm
|
||
6.ELECTRIC POWER SUPPLY
|
||||
|
Voltage
|
380V,3 phases
|
||
|
Frequency
|
50 Hz
|
Packing and Shipping
Q: Are you manufacturer?
A:Yes, We are manufacturer.
Q: How to order?
A:Please send us your inquiry by email, send message through Alibaba , Wechat, Whatsapp or others as you want.
Q: What are the payment terms?
A: Pattern :we can accept T/T,Western Union ,Money Gram.
Q: What is the whole business flow cooperation with us?
A: 1.Firstly,send your inquiry to us, make us have learned your requirement
2.We will be drawing a proforma invoice according to your requirement ,and start production after you finished to pay 30% deposit.
3.All of the goods, packing details will be send to buyer after finished production. We will arrange shipment and buyer finished to pay the balance.
Not only the Good Machine, but also the Most Attentive Service
If any doubt,feel free to contact us with no doubt!
RONEN always here for you!!